|
|
|
|
|
|
|
|
- (1)
- (1)
- (2)
- (1)
- (1)
- (1)
- (4)
- (15)
- (1)
- (1)
- (1)
- (1)
- (1)
- (2)
- (1)
- (2)
- (1)
- (4)
- (1)
- (1)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
save energy brick forming machine
|
Supply Ability: |
in store |
Related proudcts |
brick making machine, vacuum extruder, |
Specifications |
JZK |
Price Term: |
FOB |
Port of loading: |
Qingdao |
Minimum Order |
1set |
Unit Price: |
3000-10000 |
|
Brick forming machine is suitable for the production of various kinds of hollow brick made by coal gangue, shale, fly ash and clay and other raw materials. The rimer of this machine adpots the technology of metal powder spraying. Brick forming machine is a large shale sintering red brick production equipment, it is also one of good sales machines during vacuum brick machine equipment market. After crushing, ingredients, mixing ,this equipment can extrude various gangue hollow brick .
The characteristic instructions of the brick forming machine 1. The reamer is strong and durable in use ,which choose the technique of wear-resisting material spray welding with convenient repair. 2. Its first part use Manganese alloy, which can save the cost of repair. 3. It can choose different device structure based on terrain.. 4. Co***ct vacuum brick machine is suitable for shale, coal gangue, high content fly ash, desert soil of low plastic raw materials to produce hollow bricks. 5. Feed inlet is equipped with dual pressure clay tablets, with ZQ national standard gear reducer. 6. It is with high degree of automation, easy operation, high efficiency, and the price is very reasonable
Brick forming machine maintenance and service For a shale vacuum brick machine, the control system is the center of the whole equipment. If the control system has problems, we will be unable to realize the automation of shale vacuum brick machine production. So in the process of production, we want to keep maintenance for the shale vacuum brick machine control system. 1. If a long time not to start, please power on the PLC in the controlled cabinet once every 10 days , it needs 5 minutes per time, ( as long as closing air switch of KH1 , power on is ok). 2.Be careful not to let the wire or debris fell into the PLC, and also pay attention to waterproof. 3.This control system is adaptable to the environment, if the condition allows, please install it in the places of cement, breeze, sand, less dust. 4.M |
Company: |
Zhengzhou Mengda Heavy Machinery Factory
|
Contact: |
Ms. mengda fanny |
Address: |
Youyi Street No.11Gongyi, Henan Province,China |
Postcode: |
451200 |
Tel: |
0371-69599779 |
Fax: |
0371-69599779 |
E-mail: |
|
|
|